Boon Hill Amateur Astronomy   

Click here to edit subtitle

News

Observatory Maintenance

Posted by dbock1 on June 21, 2018 at 9:40 AM
Over the next 6 weeks or so, I'll be doing some much needed maintenance on the observatory. The track and rail system is 34 years old, and needs components replaced, since the outrigger wood has warped over the years. The plan at this point is to run new rail beams, and steel runners. In addition, new doors need to be built. Once these are completed, a new drive system for the roof needs to be designed and built, to allow this old guy to open it up easier. We may replace the shingled roof with a metal roof, to lighten it, and make snow removal in the winter, a bit easier.

I'll setup some working weekend events on the facebook page, soon.

https://www.facebook.com/groups/369811479741758/

Categories: Blog

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

You must be a member to comment on this page. Sign In or Register

0 Comments